This new partial expansion doesn't rule out expansion as in the original design, right? Because they're just extending the main body of the terminal and creating gates directly off it now, but originally expansions were planned to be 2 shorter concourse arms coming off the terminal's main body on either end. I'm thinking down the road when more expansion becomes necessary they would build those concourses, but just wondering if anyone heard something official about it.
They are building out one of the extensions that was originally planned for future expansion. There is still room to build another 5-6 gate concourse to the East of the main terminal building. The original design was for 30 gates, currently 35 (with the five extra being widebody gates) with room to go to 40-41 gates depending on the size.