ST. LOUIS- 300 South Broadway, 33 Floors, 337 Feet
Another high rise proposal for Downtown St. Louis. This one is across the street from Ballpark Village. Construction should start in June 2018 on this project. The cost should be around $100 Million. the architecture firm is HDA based in Chesterfield Missouri.
Last edited by Chris Stritzel; Dec 27, 2017 at 1:07 AM.
|