View Single Post
  #8973  
Old Posted Apr 14, 2012, 3:54 PM
Beta_Magellan's Avatar
Beta_Magellan Beta_Magellan is offline
Technocrat in Your Tank!
 
Join Date: Nov 2010
Location: Chicago
Posts: 648
They might be uncooperative just because UP’s UP and likes to do things the UP way.

There is still some freight still comes down to the North/Elston area (when walking down Blackhawk I was shocked to see it pull in during the day) via the UP-NW line. If we’re lucky, the amount of freight might be trivial enough that they can reschedule it to hours when passenger trains aren’t running (or maybe even stop stop it altogether). If not—or if UP’s uncooperative in rescheduling—then it makes getting a waiver more difficult.

In terms of NIMBYS, it helps that a lot of the UP-North line is elevated or trenched, and I’d say quicker deceleration and braking would be a big selling point for communities with grade crossings. You’re probably right about there still being opposition to catenary as blight, though, plus there’s be the awful “electromagnetic radiation” canard.
Reply With Quote