View Single Post
  #2744  
Old Posted Jan 13, 2011, 10:15 PM
s.p.hansen's Avatar
s.p.hansen s.p.hansen is offline
Urban Planning Proselyte
 
Join Date: Sep 2010
Location: Salt Lake City, Utah
Posts: 2,256
January Viaduct Update

Since last month visible changes at the Viaduct project have been:

1. More work on the deck itself in preparation for the pouring of concrete.
2. A massive excavation on the east side of the Viaduct to remove old pipe and such and prepare new pipe and for Geofoam.
3. The placing of many blocks of Geofoam on the west side of the Viaduct.



















FrontRunner is so awesome!













Last edited by s.p.hansen; Jan 14, 2011 at 5:45 AM.
Reply With Quote