Thread
:
Salt Lake Transit News Thread
View Single Post
#
2744
Posted
Jan 13, 2011, 10:15 PM
s.p.hansen
Exurb Enjoyer
Join Date: Sep 2010
Location: The Great Salt Lake, Utah
Posts: 2,257
January Viaduct Update
Since last month visible changes at the Viaduct project have been:
1. More work on the deck itself in preparation for the pouring of concrete.
2. A massive excavation on the east side of the Viaduct to remove old pipe and such and prepare new pipe and for Geofoam.
3. The placing of many blocks of Geofoam on the west side of the Viaduct.
FrontRunner is so awesome!
Last edited by s.p.hansen; Jan 14, 2011 at
5:45 AM
.
s.p.hansen
View Public Profile
Find all posts by s.p.hansen