View Single Post
  #2  
Old Posted Jul 20, 2010, 8:22 PM
Stingray2004's Avatar
Stingray2004 Stingray2004 is offline
Registered User
 
Join Date: Jan 2004
Location: White Rock, BC (Metro Vancouver)
Posts: 3,145
I''l take a stab from south to north:

1. Third GP lane add/on drop-off from 32nd Ave. to KGH;

2. 6-lane cross-section from KGH to Hwy 17/SFPR;
(does not take into account future Serpentine/Southern Freeway connections to Hwy 99 - ensure overpasses have enough clearance for at least 4 lanes per direction)

3. 8-lane cross-section from Hwy 17 NB;

4. New 6-8 lane cable stayed Bridge; Retain GMT for HOV lane + shoulder; GMT still requires considerable seismic upgrading;

5. 8-lane cross-section from GMT to WH/Hwy 91 exits;

6. New 4-lane Steveston Hwy interchange;

7. New Blundell Rd. interchange;

8. New WH interchange;

9. Short C/D system for WH/Hwy 91 S access/egress points;

10. 6 lanes from WH to Hwy 91 N egress/access points;

11. 8 lanes northward to 8 lane OSB, with drop-off lane at Marine Dr.

12. 6 - 8 lane expansion of Knight St. Bridge;

BTW, Delcan engineering did some preliminary review of the Hwy 99/Oak St. Bridge expansion at page 7 of the following link with cost estimates of ~$800 million. You can probably double or triple the cost estimates based upon their other estimates contained therein.

http://www.gvgc.org/pdf/MCTS_EconImpAnalys_appendR.pdf
Reply With Quote