View Single Post
  #40  
Old Posted Sep 25, 2007, 7:35 PM
M.K. M.K. is offline
BANNED
 
Join Date: Jan 2007
Location: §¡კ₪@דч®ɛ€...۩™ -> աաա
Posts: 3,934
Many of my secondary drws are other views position of one bldg with same quality, equally done.
Quote:
Originally Posted by Artem View Post
All illustrators, do you know that only third part of buildings has their drawings? So you have so much work....
I am sure if people do not waste more time drawing the already top drawn ones, we would have much more empty spaces completed.... I am trying to do my job, but if the requests sections are not catch in attention of most of Editors, it is difficult to draw what is pending corrections. So, please EDITORS:
Try to get a harder work in cleaning the Request/Corrections area daily. Thanks.


THEc: Tim, don't you want to make just 8 diagrams more to reach the 1000 Mark?!. I am sure SSP would give you a Gold Medal (Gold Building Miniature 20kila---) for your great job as recognize of your effort.




Last edited by M.K.; Sep 25, 2007 at 8:04 PM.
Reply With Quote