View Single Post
  #14  
Old Posted Jan 27, 2018, 2:27 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,840
Was looking at the filings to get a height/floor figure.
= = = = = = = =


Quote:
Proposed
Structural Occupancy Category: II - OTHER THAN I, III OR IV
Seismic Design Category: CATEGORY B
2014/2008 Code Designations?
Occupancy Classification: R-1 - RESIDENTIAL: HOTELS, DORMITORIES Yes No
Construction Classification: I-B: 2 HOUR PROTECTED - NON-COMBUST Yes No
Multiple Dwelling Classification: HEXA
Building Height (ft.): 403
Building Stories: 35
Dwelling Units: 437

Log of Status:

07/19/2017 123331224 05 NB J P/E DISAPPROVED 01/25/2018 0073403 PE HAYDA PENDING
FOUNDATION WORK IN CONJUNCTION WITH NEW BUILDING.
Work on Floor(s): MEZ,CEL,SC1,SC2 001 thru 035

07/19/2017 123331224 04 NB J P/E DISAPPROVED 01/25/2018 0073403 PE HAYDA PENDING
STRUCTURAL WORK IN CONJUNCTION WITH NEW BUILDING.
Work on Floor(s): MEZ,CEL,SC1,SC2,ROF 001 thru 035

07/19/2017 123331224 03 NB J P/E DISAPPROVED 01/25/2018 0085627 PE DIFINI PENDING
SOE WORK IN CONJUNCTION WITH NEW BUILDING FILING.
Work on Floor(s): UDG,SC1,SC2,CEL,MEZ,ROF 001 thru 035

07/19/2017 123331224 02 NB J P/E DISAPPROVED 01/25/2018 0071336 PE BIENSTOC PENDING
MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION.
Work on Floor(s): MEZ,CEL,SC1,SC2,ROF 001 thru 035

07/19/2017 123331224 01 NB J P/E DISAPPROVED 01/25/2018 0020741 RA RUSSO PENDING
NEW BUILDING. ARCHITECTURAL WORK.
Work on Floor(s): MEZ,CEL,SC1,SC2,ROF 001 thru 035