Quote:
Originally Posted by mr.x
^ it should be at around $100-120-million per km.
|
Should be much lower than that... Millennium Line is done at less than 50 millions per km, and I think they are "easily elevated sections". So including inflation, it would be at 60~65 millions per km in 2009 dollars. At grade section should be even cheaper, and my guess is around 30~45 millions per km (provided that there's an existing ROW).