View Single Post
  #367  
Old Posted May 3, 2010, 1:58 PM
shakman's Avatar
shakman shakman is offline
Chairman
 
Join Date: Jun 2002
Location: PRMD - People's Republic of Maryland
Posts: 2,672
Quote:
Originally Posted by shane453 View Post
They've said 2013. I've heard that full height of the structure would be complete by the end of this year, then leaving 2011-2012 to finish out the inside. If that seems plausible at all.
It is plausible. What may take the most time relative to interior construction is the intergration of all of the various systems. I have been through those processes and it is a very are long and tedious.
__________________
"I measure the value of life not by how much I have, instead by what I have done.

-sb