Thread: Calgary Roads
View Single Post
  #2670  
Old Posted Feb 3, 2012, 4:29 PM
5seconds 5seconds is offline
Closed account
 
Join Date: Mar 2011
Posts: 935
Quote:
Originally Posted by Bassic Lab View Post
I imagine that a bridge between Shaganappi and Sarcee (or connecting the two portions of Sarcee) would immediately cause bottlenecks at Sarcee@Bow and Sarcee@Glenmore and worsen the traffic on the Glenmore Causeway as more people find it easier to reach the SE industrial parks from the NW. By making it easier to reach the SE it would promote more job growth there. In the longer term, with interchanges at Bow Trail and Glenmore, the Causeway would get worse as more jobs move to the SE.
Once the West leg of the Ring Road is built, we won't have to imagine. The SWCRR plans of 2009 called for Glenmore trail to be a 10 lane expressway at the completion of Stage 1, though I haven't seen the City's plans for actually doing that, or doing anything about Glenmore/Crowchild. I think bottlenecks downstream from the SWCRR will be a given, but I wonder to what extent.
Reply With Quote