View Single Post
  #27  
Old Posted Jun 9, 2017, 9:55 PM
chris08876's Avatar
chris08876 chris08876 is online now
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,840
On the BQE today, you could see the signs stating the closing hours. Drove over it today, the last day.

In a traffic filled route, god forsaken Staten Island Expressway on a Friday afternoon.

But anyways...

==========================

==========================

Goethals Bridge closes Friday, to be replaced by twin spans



Quote:
It's the last day for the Goethals Bridge.

The 89-year-old span that connects Elizabeth, New Jersey, with Staten Island, New York, will close Friday and be replaced by twin spans.

New York-bound traffic will use the first of the twin spans Saturday afternoon. New Jersey-bound lanes will open late Sunday afternoon. The second of the twin spans will open in 2018.

The new Goethals Bridge spans will each have three 12-foot lanes along with 12-foot outer shoulders and 5-foot (2-meter) inner shoulders.

The Port Authority of New York and New Jersey says the $1.5 billion cable-stayed crossing is the agency's first new bridge opening since the Bayonne Bridge was completed in 1931.
=======================
http://www.newsday.com/news/new-york...ans-1.13724112
Reply With Quote