Quote:
Originally Posted by Slide
^I dont think it was ever meant to do 5 minute frequency? I could be wrong, but i remember that being one of its limitations right from the start. The best it could was 10. Or maybe it was 5. This was all so long ago i nearly forgot about this line...
|
5 minutes is the eventual peak hour frequency for the line, but they don't want to go all of the way at the start in case of technical issues (or something). They cited the issues with opening Ottawa's LRT as one of the reasons why they want to ease into it.