Thread
:
NEW YORK | Penn Station / MSG Renovation
View Single Post
#
146
Posted
Jun 21, 2012, 2:29 PM
islandxtreme26
Registered User
Join Date: Oct 2011
Posts: 46
Hey guys, I'm doing work on Phase 2 of the MSG renovation and snapped some pictures on Tuesday night:
View from 300 Level Concourse with 300 Level Seating Sections Removed:
Looking Down From One of the Spot Lighting Platforms in the Ceiling:
Inside the Attic Above the Ceiling - The Dustry Cylinder in the Middle is Directly Above the MSG Scoreboard and is a Water Tank to Collect From the Roof Drains Before Being Pumped Down to the Street:
Behind the 400 Level Seating for Removal of Decking on the 10th Floor:
View From the old 400 Level:
Removal of Steel at the 10th Floor:
View of Demolition From the Arena Floor:
Last edited by islandxtreme26; Jun 21, 2012 at
2:48 PM
.
islandxtreme26
View Public Profile
Find all posts by islandxtreme26