View Single Post
  #146  
Old Posted Jun 21, 2012, 2:29 PM
islandxtreme26 islandxtreme26 is offline
Registered User
 
Join Date: Oct 2011
Posts: 46
Hey guys, I'm doing work on Phase 2 of the MSG renovation and snapped some pictures on Tuesday night:

View from 300 Level Concourse with 300 Level Seating Sections Removed:






Looking Down From One of the Spot Lighting Platforms in the Ceiling:




Inside the Attic Above the Ceiling - The Dustry Cylinder in the Middle is Directly Above the MSG Scoreboard and is a Water Tank to Collect From the Roof Drains Before Being Pumped Down to the Street:




Behind the 400 Level Seating for Removal of Decking on the 10th Floor:




View From the old 400 Level:




Removal of Steel at the 10th Floor:




View of Demolition From the Arena Floor:



Last edited by islandxtreme26; Jun 21, 2012 at 2:48 PM.
Reply With Quote