I remember the below-grade phase took excruciatingly long on Waterview - to integrate the multiple uses into the tight site plan, and to support a slender tower of 90 stories. (This was going to be the tallest ever non-full-block (or sub-half-block if you want to get technical about JHC) building in Chicago, or the world, or something like that.)
It'd be such a shame to let that infrastructure go underused, including that it's one of the few remaining sites benefiting from a bi-level roadway.
Last edited by denizen467; Sep 18, 2010 at 8:06 AM.
|