Quote:
Originally Posted by milomilo
That the line ended up being too expensive and needs to be staged I think is a blessing in disguise, as it will allow us to look more critically at the surface running on Centre St.
|
I recall reading a number of posts about this section of the line and some alternatives but was there an agreement about the best option? Would it be a continuation of the tunnel to McKnight?
I'm concerned with how LRTontheGreen reported that going just from 16th Av to 96th will cost nearly $2B with the current track configuration, when and if the City will ever have the funds to build a proper NC line.