Quote:
Originally Posted by Spoiler
Oops, my bad!
Can someone who is better at reading these plans tell me if the path goes below the streets or not? To me, it looks like the answer is no.
|
Here is an album with all the conceptual renderings.
http://imgur.com/a/UFkQP
The entire project will be below street level. There is on root ion for one section that would keep the creek covered but I doubt that option is the one that happens. That's a "in case they can't but the right of way" option.