Quote:
Originally Posted by You Need A Thneed
If boring such a tunnel under the river is too difficult, they will do something different. The point is that $300M per km is enough to cover the cost. If boring would cost more than that, they won't bore.
|
Of course. Which is why I said that they will go with a bridge if this is done at all.