Posts: 4,506
Quote:
Originally Posted by prokowave View Post
They are building out one of the extensions that was originally planned for future expansion. There is still room to build another 5-6 gate concourse to the East of the main terminal building. The original design was for 30 gates, currently 35 (with the five extra being widebody gates) with room to go to 40-41 gates depending on the size.
If i remember correctly the future terminal d which would be to the east would actually resemble terminal b and c more than terminal a if built.