View Single Post
  #2  
Old Posted Mar 29, 2016, 12:25 AM
PHXFlyer11 PHXFlyer11 is offline
Registered User
 
Join Date: Aug 2013
Posts: 1,440
Quote:
Originally Posted by RonnieFoos View Post
Circles is apparently much further along than we have thought. The glass on the corner is now covered on the inside with tarp. There were several guys with green vest in the parking lot (looked to be doing work on the roof). I spoke with one and he stated that half of the building is slated to be demo'd and the other half is to stay up. When I mentioned the highrise, he stopped at that point not wanting to say anything more than that.

So, that's what I have so far, but look to see some work to be done soon.
Seems as if he is just part of a demo or preservation crew. It could sit for awhile after demo like Paz, but I hope not.

I didn't get a great look, but thought I saw additional equipment including a water truck on site at Edison today.
Reply With Quote