View Single Post
  #19  
Old Posted Apr 26, 2011, 6:58 PM
JET JET is offline
Registered User
 
Join Date: Feb 2007
Posts: 1,814
Quote:
Originally Posted by halifaxboyns View Post
Typical transit oriented development (TOD) is plotted based on a maximum 20 minute walk; which usually ends up with a 600m radius from the typical station point. I've not measured the distance from the ferry terminal to the site but it sounds like it might meet that condition; so it could be considered TOD.

But I agree with you - its doubtful there would be any significant effects on the lake.
The #62 bus travels in front of this site, and travels between the Dartmouth Ferry and Penhorn 'Mall'.

Given the site alignment for the building, sun and wind for the lake shouldn't be an issue.
Reply With Quote