Quote:
Originally Posted by mooky
Oh. Perhaps I misremember. Was is just in the original budget for a design of the second bridge, but not specifically by him then? Cause in the past I thought all the talk was off two bridges being planned, but only the first was funded for construction.
|
No, the original budget had a number included for the design of the second bridge (by the east village), to be designed by someone else (likely a design competition), and funded by the CMLC. So, the second bridge is funded, just not by the city.