View Single Post
  #108  
Old Posted Feb 10, 2012, 1:51 AM
k1052 k1052 is offline
Registered User
 
Join Date: Oct 2007
Posts: 2,237
Quote:
Originally Posted by aquablue View Post
I don't think that is possible. No connection to GCT for NJT. Amtrak uses overhead so does NJT, GCT uses third rail.
I mean turn the unused lower level platforms into a terminal for NJT/Amtrak. The power systems don't have to be compatable for NJT since that would be the end of the line. Some Amtrak Genesis locomotives already have 3rd rail shoes for Penn Station...shouldn't be that terribly difficult to figure out a way to switch to under running when stopped so they can proceed up MNRR territory.
Reply With Quote