View Single Post
  #78  
Old Posted Jan 19, 2009, 8:00 PM
wrenegade's Avatar
wrenegade wrenegade is offline
ON3P Skis
 
Join Date: Sep 2008
Location: Lower Lonsdale, North Vancouver, BC
Posts: 2,593
Quote:
Originally Posted by paradigm4 View Post
There's no possible way it could be finished by 2012. The friggin Evergreen Line and Port Mann aren't even scheduled to be done by 2014.
Remember the I-35W bridge over the Mississippi that collapsed in Minneapolis? The replacement was designed and completed in approximately 13 months. If it needs to be done, it can be done.

http://en.wikipedia.org/wiki/St._Ant...s_(35W)_Bridge
Reply With Quote