Quote:
Originally Posted by paradigm4
There's no possible way it could be finished by 2012. The friggin Evergreen Line and Port Mann aren't even scheduled to be done by 2014.
|
Remember the I-35W bridge over the Mississippi that collapsed in Minneapolis? The replacement was designed and completed in approximately 13 months. If it needs to be done, it can be done.
http://en.wikipedia.org/wiki/St._Ant...s_(35W)_Bridge