Quote:
Originally Posted by PoscStudent
I was wondering if the sea water heating and cooling system was to blame for the length it's taking to see real progress? I assume that's something they'd need to get done early.
|
I was thinking that as well. Such things require intense drilling on site, which we know is a difficult task here in Newfoundland. However, once all that is done and they start adding floors, I imagine things will go much quicker (like the MUN residence houses).