Quote:
Originally Posted by Skeletor
There's plenty of room under there. They can fit at least 6 lanes in the middle section. They can remove the sloped concrete embankments and put in a retaining wall for more room for the C-D lanes if necessary. Could likely squeeze at least 12 lanes total under that bridge.
|
I was through there again today and my concern is the center opening - there is only room for 4 lanes (2 each direction) and a Jersey barrier. If they want to reuse the existing bridge then the Glenmore lanes (going same direction) will be separated by a pier.
(that post make any sense ?)