View Single Post
  #21  
Old Posted Apr 24, 2014, 2:55 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
How is the reconstruction of Port Au Prince coming along? Are there lots of projects still ongoing?

Also, has the final design for the National Cathedral and Presidential Palace been selected yet?
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote