Quote:
Originally Posted by EastVanMark
|
I dunno, linking the reconstruction of the marquette interchange versus the removal of the Park East freeway IMO is a reach. if you look at the
network geography, i would think that their effects are independent of each other:
The dashed roads are the never-built freeways and the roads outlined in black are limited access freeways. You can see what the Park east was suppposed to do and why it was underutilised and not really part of the larger network.
other traffic studies prior to the park east removal also suggested that
traffic effects would be more local to the stub and could be accommodated by expanding the surface grid after the removal, which is more analogous to vancouver.
Also of note - the cost for removal of the park east was
$25 million (ignoring any increase in tax base revenue due to redevelopment/repopulation). For the Marquette reconstruction it was
$810 million.