Quote:
Originally Posted by Biff
Thanks, i knew they were just waiting for a tenant to continue but i didn't realize that they were going that far. It seems like a pretty big (tall) core to leave as a stump. Thanks for the reply.
|
The retail levels above street level will open, that's what they are building. The office floors above the retail space will be built once a tenant signs 400,000 sf of space in the building.