Quote:
Originally Posted by chrisvfr800i View Post
Level 45 was placed on 12/27/16, with 10 levels to go from there until top-out.

(Note: there are 57 slab levels above grand ave.)
Does that mean that the floor for 45 was poured? A separate question is if the core is the official topping out point?