View Single Post
  #733  
Old Posted Sep 27, 2019, 1:33 PM
Londonee Londonee is offline
Registered User
 
Join Date: Aug 2005
Location: Fitler Square (via London)
Posts: 1,657
Why does a project of this scale only have a single tower crane?

Was just in London and it was quite common for projects of much smaller scale than this to still have 3-4 cranes operating at the same time.

Is this a weird union thing? Is it purely economical?
Reply With Quote