Posted Jul 21, 2018, 3:32 PM
|
Registered User
|
|
Join Date: Apr 2015
Location: SLC
Posts: 134
|
|
Quote:
Originally Posted by Makid
Patrinely had/has Utah SIMS for roughly 20% of Phase 1. But, when I looked at their website, it has them opening in the fall of 2019. http://utahsimscenter.com/index.html
If the dates for the leasing of Patrinely are correct, by this time next year we should hopefully have Tower 8, Liberty Sky, 370 Millenium (Held), 650 Main (Patrinely), The Exchange, and Block 67 Phase 1 (11 Story Residential Building and 11 Story Hotel) all under construction. This doesn't include the possibility for 255 S State (RDA Property) that the proposals are due back the end of this month, nor the Paperbox property that should start demolition and construction later this year.
|
Also possible near downtown are the Marmalade Block apartments/mixed use project and a bit more problematic, the Violin School project. I would love to see a flock of cranes again.
|