View Single Post
  #36  
Old Posted Apr 6, 2007, 12:06 PM
Citrus-Fruit Citrus-Fruit is offline
Registered User
 
Join Date: Mar 2005
Posts: 744
*105m, 81m, 61m, and 58m Office blocks are planned for Masshouse.

*Other blocks in scheme include 2 x 14 storeys (51m) - U/C.

*Arena Central - 7 blocks ranging from 12-18 floors and 51 storey V Tower.

*43 Storey Snow Hill residential including 23 storey hotel tower. 4 blocks currently u/c at 137m, 84m, 75m and 57m.

*Cube - 17 storey (69m) mixed use development currently on site.

*Orion phase 4 - 18 storeys U/C.

*Opal Court topped out - 18 storeys.

*Peat House 14 storeys (59m) U/C

*Colmore Plaza 14 storeys (60m) U/C

*42 storey Broad Street Tower approved. Construction late 07 early 08.
*176m Vertical Theme Park - proposed. planning summer 07.

*Venture East - possible 24 storey hotel tower. Planning summer 07.

*Great Charles Street. Eric Kuhne/Dandara possible 80m residential tower. planning.

*City Park Gate - 22 storeys 83m residential tower approved.

*Natwest Tower replacement. 80m+ British Land - planning, spring 07.

*Cumberland House - Complete demolishment of exisiting structure. Mixed use development. (60m)

*New Street Station - outline approval for twin 40 storey towers depending on funding.

*33 storey 110m Martineau Galleries redevlopment - outline approval.

*Possible 17 storey mixed use development Holloway Circus. Detailed planning. Submition summer 07.

*2x 18 storey student accomodation blocks Aston University. Planning summer 07.

Last edited by Citrus-Fruit; Apr 16, 2007 at 6:06 PM.
Reply With Quote