Here is the latest news on major developments:
Signature Tower
http://www.signaturetowernashville.com/
*Will be tallest skyscraper in the US outside New York and Chicago upon completion in 2009, surpassing Bank of America Atlanta
Height has been reduced to 1,030 ft. Ground breaking is scheduled for December/January after several delays.
The Pinnacle at Symphony Place
29 stories - 432 ft - completion slated for 2009
Excavation is nearly complete. Base for tower crane is in place!
ICON
A little more than halfway up.
The Encore
Has been topped out. Crane is removed.
1201 Demonbreun
20 and 22 floors
No new news. Was scheduled for 2008 (?).
Westin Nashville
19 stories - 201 ft
No news lately. Groundbreaking postponed.
West End Summit
Tower 1 -
385 ft - 26 floors
Tower 2 - 285 (?) ft - 23 floors
Excavation nearly complete. Should install crane within weeks.
The SoBro
25 stories
No news on this one.
[
Adelicia Condos
18 stories
Topped out, should open soon.
SunTrust Plaza Nashville
200 ft - 13 stories - office/mixed use
Topped Out, nearly complete
Terrazo
200+ ft - 14 floors
First floor complete
U.S. Court House - Downtown Nashville
200 +/- FT 7 floors
No news on this.
[B]
MTA downtown transit center[/B
Under construction. No mixed use or apartments, however.
Rhythm Lofts (at the traffic circle on Music Row)
Tower Crane is up
West End Condos
- 11 stories -
Topped out, should be open
Woodmont & Kenner
Tower Crane is up.
Rolling Mill Hill - Phase I - 1000 condos/apartments
Construction has begun.
Other prospects include:
18 story condos at 17th and Broad
Hotels related to convention Center.