Quote:
Originally Posted by MonctonRad
Here is a link to the .pdf for the RFP issued for the lengthening of runway 06/24 at the GMIA to 10,000 ft.
http://www.gmia.ca/english/What's%20...EMBER%2029.pdf
Note that they have mandated a completion date of December 1, 2013. The document contains a diagram of the project. The end of the runway will be very close to the TCH. You can also see the extension to Aviation Blvd, and how it will extend a considerable distance beyond Malley Industries. The road will run between the end of the runway extension and the TCH. I believe the eventual plan may be to have an interchange directly from Aviation Blvd to the TCH. Perhaps Myles can confirm this.....
|
Sorry, MonctonRad, I didn't even notice this comment.
What I've been told is that Aviation Avenue will extend all the way to Champlain Street at some point to completely encircle the airport.
I've never seen a plan for it yet, but I've heard a few times that the plan is to build some kind of interchange on the TCH someday.