View Single Post
Old Posted Sep 13, 2016, 4:04 PM
Atlanta3000's Avatar
Atlanta3000 Atlanta3000 is offline
Urban Cowboy
Join Date: Nov 2013
Location: Buckhead
Posts: 1,833
Originally Posted by nature's calling View Post
The second tower of the NCR campus looks to be a go. It's still in the design phase but is expected to be completed by 2019 and help bring 5300 jobs to Midtown.
Can someone with a construction background answer this:
In the ABC article it stated phase II of the project would be 250,000 square feet (Office + Retail) and the cost is $140 Million. I was like WTF.

Doing some math: Average building cost per sqft ($146.11) x building size (250,000 sqft) = $36,527,500.

How the hell is this a $140 Million building? Is it made out of gold?
Reply With Quote