Posted Aug 28, 2013, 10:26 PM
|
Registered User
|
|
Join Date: Jul 2001
Location: Vancouver
Posts: 38,359
|
|
The sidewalk along Smithe in front of the Vision Critical Building (7-11) has been ripped up for the connector bike lane (connecting from Cambie Bridge east sidewalk to Beatty bike lane)
|