View Single Post
  #493  
Old Posted Sep 13, 2016, 9:35 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,026
Quote:
Originally Posted by Kisai View Post
Of note the 135 is completely down Hastings, and is more likely to be replaced with another Skytrain/Subway line if the capacity ever warranted that. So if no Gondola gets built, it's likely the rest of the line becomes rapid-transit.
I don't see a Hastings Rapid transit Line getting as far as SFU, though... Maybe as far as Willingdon and then South along that route to BCIT, but that's a big maybe.
Reply With Quote