View Single Post
  #27  
Old Posted Dec 1, 2016, 4:53 AM
casper casper is offline
Registered User
 
Join Date: Nov 2011
Location: Victoria
Posts: 9,122
Quote:
Originally Posted by thenoflyzone View Post
The new pier is needed much faster than a new runway. Passenger numbers are increasing at a greater rate than aircraft movements, which have been more or less stagnant for the better part of two decades. 3 parallel runways are still more than enough for 440,000 movements. Heathrow handles more with only 2 runways. Don't get me wrong, the 4th parallel at YYZ should be built, but it can wait for now.

Another pier at Terminal 1 is needed asap, what with AC expanding their international footprint at unprecedented levels.
I wonder when they will get around to re-activating the infield terminal and using it for international flights again.
Reply With Quote