Posted Jan 5, 2018, 11:47 PM
|
Registered User
|
|
Join Date: Sep 2006
Posts: 2,521
|
|
With the route that has been decided upon, when all stages are constructed, what is the proposed length of time from the north terminus to downtown and from downtown to the south terminus, using low floor technology? Would that change with high floor trains (ie: does one train run faster than the other)?
|