To be fair to Chu, that was him asking the question and the City Admin answering with $1.97B. A CBC reporter also tweeted the same number, plus added a value $390 million to go to North Pointe (which seems expensive for only about 2.5 km of track in a LRT-ready area plus station). Though, the City Admin hasn't exactly been accurate in its cost estimates.

https://twitter.com/CBCScott/status/864246865944088576

Add in a tunnel for the narrow part of Centre St and we're looking at $3B for a good NC line with a reasonable terminus, plus the cost to reach the populated communities for the deep SE. My concern is with such a cost, and given how long it took the city to assemble the original funding and other infrastructure needs is that the NC line won't be built for another generation.
I think tunneling would only have to go to 64th. After that there is a wider ROW, probably for this purpose, except inexplicably just before Beddington Trail where they have not left any room. And then it's plain sailing further north.