May 25 Pictures:



^^^^ Glass seems to have been stuck around the 8th floor for a while. But I did see many crates of glazing newly delivered. I wonder if they were waiting for glass. I can see them taping and mudding in the second floor condos. The steel studs are being installed on the 14th floor or so.



They installed a few mullions on the third floor many days ago... then no more. Maybe they are just doing a little testing/practice.



^^^^ The initial floor slab has been poured in the south end of the parkade.



^^^^ The last big excavator appears to be digging its way out of the pit.



^^^^ More insulation going onto the hotel. No sign of any exterior siding yet. When the concrete was first poured the second floor had quite a cantilever over the first floor. To me it looked very good. There could have been expansive glass with no posts in the way. But the (visual) cantilever effect is being totally lost as walls are being installed on the first floor.