^^^^ They poured the first part of the second parking floor on June 7. The west side footing and wall are now in progress. They are spreading sand and gravel in preparation for another portion of the floor slab. On the left side of the image they are spreading dirt and building up the ground. So the floor there will be at a much higher level than the other side of the wall behind it. It is very difficult to see into the pit but it looks like there might be a small ramp heading down (right below where the worker in the orange vest is standing on the second floor). If it is a ramp, there will be a 90 degree turn to get to the section to the left.



^^^^ The excavator dug a path out of the pit. The side of the excavation looks much steeper in person than in the picture. Some more mullions can be seen going on to the hotel, and they are installing glass on the 9th condo floor. But other than that, not much visible progress on the hotel and condo.
Reply With Quote