View Single Post
  #182  
Old Posted Dec 16, 2018, 1:29 PM
kph06's Avatar
kph06 kph06 is online now
Registered User
 
Join Date: Dec 2006
Posts: 2,025
The excavation is at full depth and the crane base is in. This is the same crane that was used at Icon Bay, due to the proximity of the Trillium it will have to be installed at full height. It will be a big lift when it happens.


Reply With Quote