Quote:
Originally Posted by djmk
i was thinking a little more north/south from metrotown to BCIT to Brentwood. If the train goes to hastings (and prehaps to kootney loop and maybe north shore???) , it would have to be underground because there is a fabulous community in North Burnaby that would get wrecked with large cement columns. ( guess where i live )
|
It would likely be underground along hastings anyhow, unless it was built along the alleyways in the back of the street.
I doubt it would get all the way to Willingdon, however. It would probably stop at Boundary as Phase I.