Quote:
Originally Posted by gemery
So, I've just begun following this plan, but something confuses me. In the four stages image on the first post, it seems like the layout is never one long straight hallway, but in other images (like the one showing a future north concourse), those little branches aren't there. Are we getting rid of the little branches off of a main concourse or not?
Sorry if I'm not using correct terminology; I'm not too familiar with airport admin.
|
Phase I, the blue drawing, will consist of the "South Concourse Building" and the renovated existing B (most of it), C, and D.
Phase II, the yellow drawing, will remove the B, C and D and add the "North Concourse Building" This is a future plan with no timeline set for construction.