Quote:
Originally Posted by jeremy.r
I read that as "early relative to the 2022 land transfer deadline". If I'm remembering correctly the portion through TTN is supposed to be done in 2020 according to the P3 contract (2021 for the rest).
Also I don't think it's been posted here yet, aerial images from September are up on the SWCRR site:
http://www.swcrrproject.com/media-centre/photo-gallery/
|
It's clear he was talking about the construction of the road--the entire thing.