View Single Post
  #2396  
Old Posted Apr 17, 2024, 3:28 PM
Carboy15 Carboy15 is online now
Registered User
 
Join Date: Oct 2022
Posts: 249
Quote:
Originally Posted by WildCake View Post
LOL gotta love how they made one project look good by separating it into 3 interchanges

• PTH 101 at Saskatchewan Ave
• PTH 101 at PTH 190
• PTH 190 at CP Rail
^ All one project
• PTH 59 at PTH 101
It was well overdue at the time
• PTH 100 at St. Mary’s Road (ongoing project)
congrats MB!
• PTH 1 at PTH 1A – Portage la Prairie (ongoing project)
reconstruction of an existing interchange, not a new project, nice try though
• PTH 10 at CP Rail – Brandon - Daly Overpass (ongoing project)
Bridge replacement, tough to really call it an interchange, just a rail bridge that happens to have ramps on either ends because it's logical. It's a reconstruction project regardless
• PTH 100 at PTH 3 (Oak Bluff) (construction expected to start in 2025)
Hasn't started, could still be scrapped
• PTH 100 at St. Anne’s Road (project in planning phase)
hasn't started, could still be scrapped

So really three interchange projects in the last 15 years. Not bad at first glance, but it's worth mentioning that prior to Centreport, there was really nothing for what 15-20 years? So if you extended the timeline to "in the last 30 years", the list would be identical and looks way worse.
Bruh, no way.
Reply With Quote