The Unofficial Salt Lake City Project Rundown List

Disclaimer: Information contained in this Project Rundown List could change at any time, and should not be used for anything other than this forums discussions, and its informational purposes.

http://www.downtownrising.com/


PROPOSED


Eco Lofts
http://method-studio.com/work/housing/eco-lofts/
Proposed
Added: 05/19/2014
Location: Approx 440 S 900 E
Other: 6 story building with residential on the top 5, possible retail on the ground floor.

Image from method studios.


Air Hotels
http://airslc.info/
Proposed
Added: 04/30/2014
Location: NW corner of 400 S and West Temple
Other: 14 story boutique hotel. Will include a restaurant and a high end night club., roof top pool/club, 350 person multi-use entertainment space. The lot is cleared and the small two story building on the north end is already built and occupied.




Granite Furniture Block Redevelopment, Phase II
Proposed
Location: McClelland St (10th E) and Sugarmount Drive
Other: South of the completed Phase I Granite Furniture Redevelopment. Across the street from the current terminus of the S-Line Streetcar



4th & 4th Apartements
Proposed
Floors:5 floors, 122 apartments
Location: NW Corner 400 E 400 S on the former Sizzler site.

Image from www.beecherwalker.com


Denver Street Apartments
Proposed
Floors:5 floors
Location: 448 E 400 S



341
Proposed
Other: Developed by Garbett Homes, looks to be Garbett's first city core project. http://www.garbetthomes.com/
Other: Previous proposals on this site, Metro Park West, and Townhomes.
Floors:5-6 floors
Location: 341 S 400 W (between 400 W and Rio Grande St




151 Tower
http://www.dixonslc.com/?section=office
Proposed
Updated: 04/30/2014
Floors:18
Other: Tower building proposed by Boyer as part of their recent purchase of the former Questar and adjacent properties to the south and then to the west. A parking structure to the east, mid block, is currently under construction.
Location: 151 S State

photo credit: Dixon & Associates


City Creek Center - The Cascade
http://www.citycreekliving.com/
Proposed
Floors:19
Other: Residential Condos. The base has been constructed up to level 2. The residential units above will be constructed as economic conditions and demand grow.
Location: approx 51 West 100 S


Social Hall Tower 1
http://www.cowboy.us/citycreekcenter.php
Proposed
Floors: unknown
Other: Residential.On Hold until market demand improves.
Location: NW corner 200 E 100 S



CCC Tower 8
http://www.downtownrising.com/city_creek/
Proposed
Floors: 20ish
Other: Future Planned Tower. Timeline unknown.
Location: NE corner State and 100 S


World Trade Center plaza
http://www.wtcut.com/
Proposed
Floors:Unknown, but RFPs call for a 25-30 floor tower
Address: The location of this rendering shows 200 South and State Street, but no official site has been chosen yet.
Other:Future Planned... looking for 700,000 sq ft of office space. They are looking for a plaza of buildings as well. We could see a smaller 10-15 floor tower on the plaza as well, as seen in the pic. Final renderings have not been released yet.



Ballpark Lofts
Proposed
Updated 11/14/2012
Floors: 4-5
Units: 30 - 40 residential units
Location: 1380 S West Temple
Other: First floor retail, structured parking garage, rooftop garden with patio overlooking Spring Mobile Ballpark. The project sign is no longer on the site.



Hardage Group Redevelopment
http://www.thehardagegroup.com/index..._lake_city.htm
Proposed
Location: 400 S 800 E



University Station
Proposed
Address: SW Corner 400 S 900 E Currently Office Max
Other: 2.24 acres -140 units designed for 464 student residents



Brunswick Apartments
Proposed
Location: 245 South 200 East



DA Building
Proposed
Location: NE Corner 500 S and Main
Other: County has purchased the parcel at this location and will most likely be selling the former parcel at 600 S and State SW Corner
Image is from the formerly proposed location, no image for 500 S and Main has been released.



Westgate Lofts - Redevelopment
Proposed
Location:
http://www.clearwaterhomesutah.com/s...lofts-westgate






http://www.clearwaterhomesutah.com

.


UNDER CONSTRUCTION


Encore Apartments
Under Construction
Address: NW Corner 400 S between 500 E and Denver Street.
Other: 189 Units



Hope Lodge
Under Construction
Address: NW Corner 100 S 400 E
Other: Project by the American Cancer Society. A facility designed for those that come to Salt Lake City from around the state and neighboring states for cancer treatment.



Seasons at Library Square
Under Construction
Other: Same developers as Seasons at City Creek.
Other: Developers have been into the planning office to discuss the project.
Floors:5 floors
Location: SE corner of 500 S and 300 E

photo credit: Tuttle & Associates


111 Tower
Under Construction
Updated: 04/30/14
http://111southmain.com/
Floors:23 387'
Other: The Tower being built by City Creek Reserve in conjunction with the Performing Arts Center. Steel has started to rise on the property.
Location: 111 S Main



Performing Arts Center
http://utahperformingartscenter.org/
Under Construction
Floors: 3-5
Other: Steel has started to rise on the property.
Location: SE Corner of Main and 100 S



600 West Apartments
Under Construction
Location: Approximately 50 N 600 W, east side of the street
Other:Proposed as mixed use, residential and retail. The mural in the rendering is just an example, that will not be the mural on the building.



Capital Theater- Ballet West academy
Under Construction
Floors: 4
Location: Adjacent to Capital Theater, west side
Other: Funding has been approved, ground breaking should occur in 2012



Cowboy Partners - Sugar House - Liberty Village
Under Construction
Address: Aprox 2150 South McClelland Street
Other: 171 Units with underground parking


State Street Plaza
Under Construction
Floors:10 & 7
Location: Approx 251 South State, east side
Other: 180 Units




Broadway Park Lofts
http://www.broadwayparklofts.com/pages/index.php
Under Construction
Floors: three 7-8 story buildings
Other: Completed units in the rear building were auctioned in February 2012 to raise capital, now under new ownership. New ownership applied for a $4.5 million loan for the RDA on 11/13/2012 to pay off purchase financing and use to complete construction of remaining units. 11/14/2012


Sugar House Crossing
Under Construction
Address: 2100 South & McClelland Street
Other: Mixed use development in sugarhouse. Will include up to 6 stories of offices and 7 stories of condominiums and & retail.


ESA Hotels
Under Construction
Address: 100 S between 300 and 400 W directly across the street from Energy Solutions Arena
Other: Two six story hotels, with retail on the first floor, and a parking garage. One Hotel will be a Hyatt House, 137 rooms. The other will be a Courtyard by Marriott, 175 rooms. Hyatt House on the corner of 100 S and 300 W will be the first of the two hotels built.



Images from www.beecherwalker.com


Newhouse Apartments
Under Construction
Location:540 East 500 S
Other Underground Parking is currently under construction





COMPLETED


101 Building
Completed
Address: 101 S 200 E
Other 9 floors, plus roof top mechanical and the front tower would be taller.



US Federal Courthouse
http://www.tphifer.com/
Completed
Updated: 04/30/2014
Floors:10
Location: NE corner 400 S W. Temple



Granite Furniture Block Redevelopment
Completed Phase 1
Location: 10th East 2100 S




Liberty Gateway
Completed
Floors: 5 stories
Location: Approx 500 W and 50 S
Other: 160 Residential units. Project is back on track, should break ground soon.



CityScape Apartements
Completed
Address: 150 S 400 E
Other: 122 units, amenities will include a rooftop courtyard and spa, business conference center, dog park, outdoor fireplace and barbecue areas.



Public Safety Building
Completed
Floors: 4
Location: NE corner 500 S 300 E



21 & View
http://21andview.com/
Completed
Location: 2100 S and View Street, about 1350 East
Other: 29 Units with two signature office/retail spaces.



Lotus Apartments (Formerly the Madeline apartments)
Completed
Location: 338 East South Temple
Other: 84 Units




IHC Clinic
Completed
Floors: 4
Location: NE corner 4th S 9th E


Eastside Apartments
http://pegdevelopment.com/commercial...ide-apartments
Completed
Floors: 3-6 stories
Location:

By SLC801


FBI Building
Completed
Location: International Center

Deseret News


The Sugarhouse Apartments
http://sugarhouseapartments.com/
Completed
Location: 2057 South 1200 E
Other: 70 units; Studio, 1 bedroom, 1 bedroom + Den and 2 bedroom units. Fitness Center, rooftop garden and lounge area with gas grill. Looks to be a nice project. These are being developed by the same company that did Urbana.



Merrimac Townhomes
Completed
Location: 38 West Merrimac (just south of Spring Mobile Ballpark)
Other: Five town homes on .343 acres.



644 City Station
Completed
Location: Approx 644 West North Temple
Other: 132 units
http://644.punchlinedev.com/



Gateway Office building
Completed
Floors:5
Location: North end of Gateway, approx 450 W 50 N

[
B]Broadway Place Apartments (Senior Apartments)[/B]
http://pegdevelopment.com/commercial...ace-apartments
COMPLETED
Floors: 4 Stories
Location: Approx 550 E 300 S


Rendon Terrace Apartments (Senior Housing)
COMPLETED
Location: Approx 150 North 600 West


Biomat Building
COMPLETED
Location: Approx 620 West North Temple


Goldman Sacs
COMPLETED
Location: 222 South Main

Pic By StevenF.


Other projects in the works for Downtown SLC include:

-Large 1,000+ room convention center hotel.
-Over 4,000 residential units planned/under construction in Downtown Area.
-There have been discussions off and on of various towers and mixed use buildings on Block 70.



Other Projects located within a 3 mile radius of Downtown Salt Lake




..