It doesn't work that way, you can't just keep adding more and more longer trains until all are satisfied because the surface crossings and reduced speed at which the LRT operates through the core are a hard limit we have already hit. And obviously a train can't be longer than a city block downtown.
Trains already get backed up all the way to SAIT.
__________________
Public Administration 101: Keep your mouth shut until obligated otherwise and don't get in public debates with housewives.
|