View Single Post
  #115  
Old Posted Jun 24, 2017, 12:31 AM
The ATX's Avatar
The ATX The ATX is offline
Moderator
 
Join Date: May 2006
Location: Where the lights are much brighter
Posts: 12,044
Quote:
Originally Posted by drummer View Post
I noticed they've laid a lot of double tracks at crossings to make it easier to actually add a second track down the road. Does anyone know when they would actually add a second track? Is that going to coincide with the eventual downtown station upgrade?

Either way, I'm thrilled that this development is pushing forward and finally making something out of that land. As always, could have been better, but something is better than nothing.
I read somewhere the double tracking would occur at several locations to allow trains to pass each other when the two new trains (and a schedule with more frequent stops) come on line.
__________________
Follow The ATX on X:
https://twitter.com/TheATX1

Things will be great when you're downtown.
Reply With Quote